A shower is the only part of a bathroom that is deliberately soaked several times a day, and it is where nearly every bathroom failure we get called about begins. The two versions of that failure are easy to tell apart once the enclosure is open. Either water has been getting past the tile at the curb or the valve and sitting in the wall, or the pan itself has failed and has been wetting the framing and the subfloor underneath. Resurfacing over either one buys a year or two and makes the eventual repair worse. So we take the enclosure back to framing, look at what the water has been doing, repair what it damaged, and then build the shower as a single waterproofed assembly where the pan, the curb and the walls are one system rather than three. In the older Pomona housing that usually means dealing with a mortar-bed installation and a valve that predates any modern standard. In the midcentury and later homes it usually means removing a fiberglass surround that has been leaking at the seam. The rebuild is the same discipline either way, and the glass goes in last, after the walls are set and cured and templated for real.
You get a scope that shows the demolition, the repair and the finish work as separate lines, because the middle one is the part nobody can price honestly from the doorway. Valve replacement is planned into the job rather than discovered during it, since reaching a valve after the wall is closed means opening it again. Niches, benches and slope are set out before tile starts. We tell you at the walkthrough which parts of the schedule are curing time and inspection time, so the calendar makes sense before we start.

Pan, walls, niche and bench built to the room rather than to a kit.
Existing enclosure stripped back, waterproofed and rebuilt with new tile.
Valve replacement and glass fitted after the walls are set and cured.
Proudly serving Pomona, Diamond Bar, La Verne, Claremont, Walnut and San Dimas for years.
Ten services, from a single vanity swap to a full remodel that moves fixtures. Tile, vanity and flooring installation are quoted as standalone work, because plenty of bathrooms need one of those and nothing else. The larger remodels are scoped after we see what is behind the wall.

Diamond Bar, La Verne, Claremont, Walnut and San Dimas each run their own building department, and two of them sit on different water systems than Pomona. That is not trivia. It sets who inspects your plumbing, how long plan check takes, and whether the job needs a second approval before a permit is issued.
Frequently Asked Questions
Bathroom Remodeling can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
There is no single number, and anyone giving you one before seeing the room is guessing. Cost follows whether fixtures move, whether the supply and waste lines behind the wall get replaced, the size of the tiled area, and what the permit scope turns out to be. A vanity and floor swap in an existing footprint and a remodel that relocates the drain are not comparable jobs. We price after a walkthrough.
Usually whatever forces plumbing to move. Relocating a toilet, a tub drain or a shower valve means opening the floor or the wall, re-running lines, and adding inspections. Tile and fixtures are visible and feel expensive, but they are predictable. The costs that surprise people are the ones behind the surface.
If the work touches plumbing, electrical or structure, yes. Pomona issues building, plumbing, electrical and mechanical permits through Building and Safety at City Hall on Garey Avenue, and the counter runs Monday through Thursday. Swapping a vanity into the same footprint is a different conversation than moving a shower valve. We tell you which category your job falls into at the walkthrough, and we pull the permit.
Schedule follows the permit and inspection sequence, whether fixtures move, and lead times on tile and glass. A single-scope refresh in an existing footprint and a remodel that relocates the drain are not comparable. What we can commit to is a sequence at the walkthrough, so you know which weeks the room is unusable and which are waiting on an inspection.
It depends on what is driving it. Replacing a failing shower pan or a floor that has been getting water under it for years is not really optional, and putting it off makes the eventual job bigger. A cosmetic update is a different decision and worth being honest with yourself about. We will tell you when we think a repair is the better use of your money.
Because more trades work in that one small room than anywhere else in the house. Demolition, plumbing, electrical, waterproofing, tile, glass and finish carpentry all have to happen in sequence, in a space where two people can barely work at once. Add the inspections that plumbing and electrical trigger, and a small room absorbs a lot of labor.
It depends almost entirely on what is behind the existing enclosure and whether the valve or drain moves. A rebuild in the same footprint with sound framing is a very different job from one where the pan has been leaking into the subfloor for years. Tile choice matters less than most people expect. We open the enclosure and price from what is actually there.
Yes. Rebuilding a tub surround is a common job on its own, and it is often the right one when the tub itself is in good condition and you use it. We rebuild the wet walls and the waterproofing around the existing tub and leave the fixture in place.
It covers the surface and leaves whatever caused the problem in place. If the tile is cosmetically tired but the substrate behind it is genuinely sound, that is a legitimate conversation. If water has been getting into the wall, a liner traps it. We will tell you which situation you are in after we open a section.
Usually yes, because a shower rebuild almost always involves the valve, the drain or both, and plumbing work is permitted. In Pomona that routes through Building and Safety at City Hall on Garey Avenue. We pull it and schedule the inspection, and the inspection point is built into the schedule you get at the walkthrough.
Plan Your Pomona Shower Remodel
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their Bathroom Remodeling needs.

Our house in the Lincoln Park Historic District still had the original hex floor and a cast-iron tub, and every contractor we called wanted to rip all of it out. These were the only ones who asked what we wanted to keep. They matched the tile pattern in the shower and rebuilt the wall behind it properly.
Rosa M.

We converted the tub to a walk-in shower in our Phillips Ranch house so my mother could stay with us. The original fiberglass surround came out and they found the subfloor was soft in one corner, which they showed me before doing anything about it. Permit and inspection were handled without me chasing anyone.
Kenneth P.

I asked for a full remodel of the hall bathroom and they talked me out of half of it. The vanity and the floor genuinely needed replacing, the tub did not, and they said so. Quote came in for the work that mattered and the job finished on the schedule they gave us at the walkthrough.
Yvonne T.
Ready to hear more about expert services at ?
Contact us today to receive a detailed, no-obligation quote.